Close
Our store is at 0% of its capacity at the moment.
Your order should be processed within 30 day(s).

Underlever Charging Handle Kits

Batch 5 Underlever Pre-orders are now open, with delivery expected in October 2024.

All Batch 5 underlevers will be produced using the split-assembly method where the lever is produced in 2 halves which are then permanently bonded together with steel pins, so they will look slightly different to the pictures shown, with a thicker area under the trigger guard. Function and strength is unaffected.

There are still several single-piece levers leftover from Batch 4 which are marked "IN STOCK" which are ready for immediate dispatch.